0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Causes, Effects, and Mitigation Measures of Time and Cost Overruns in Water Supply Projects: Case of Tigrai Region, Northern Ethiopia

This publication lists 32 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10727337
  • Published on:
    30/05/2023
  • Last updated on:
    30/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine