Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility
Author(s): |
Chao Wang
Min Liu Simon M. Hsiang Michael L. Leming |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, June 2012, n. 6, v. 138 |
Page(s): | 775-785 |
DOI: | 10.1061/(asce)co.1943-7862.0000475 |
- About this
data sheet - Reference-ID
10155226 - Published on:
11/12/2018 - Last updated on:
11/12/2018