0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Catenary-, Energy-, Communication- and Signalling Systems in the Koralm Tunnel

Author(s):


Medium: journal article
Language(s): English
Published in: Geomechanik und Tunnelbau, , n. 4, v. 1
Page(s): 279-285
DOI: 10.1002/geot.200800030
Abstract:

After finishing the 32.8 km long Koralm railway tunnel a bottleneck for the Alps-crossing railway traffic will be disposed. This paper deals with the technical installations in the tunnel. The technical components have to be simple and very safety for breakdowns. All components are redundant systems and a total breakdown of them is very improbable.

Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.200800030.
  • About this
    data sheet
  • Reference-ID
    10031960
  • Published on:
    20/01/2009
  • Last updated on:
    15/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine