0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10637334
  • Published on:
    30/11/2021
  • Last updated on:
    24/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine