0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A case study of a partially pre-stressed multi-storey building incorporating fast-track construction

Author(s):


Medium: journal article
Language(s): English
Published in: Australian Journal of Civil Engineering, , n. 1, v. 8
Page(s): 27-40
DOI: 10.1080/14488353.2010.11463954
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/14488353.2010.11463954.
  • About this
    data sheet
  • Reference-ID
    10300917
  • Published on:
    22/02/2019
  • Last updated on:
    22/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine