0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Case of the Bungled Bridge Rehab

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 6, v. 54
Page(s): 43-45
Abstract:

Foundation failures and rehabilitations concern the owner, the engineer and the contractor. These parties face liability to one another as well as to third parties. There are contractual obligations among the parties, potential liability for negligence, and special burdens where the construction involves ultra-hazardous activities and innovative designs. Contractual indemnities, manufacturersÂ’ warranties, bonding and insurance can shift or reallocate risks and liabilities. Due consideration of risks should be given before foundation design or construction is undertaken. The risks should be clearly defined and fairly allocated in the contract documents between the parties. This article presents a hypothetical case study of a bridge foundation failure.

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015636
  • Published on:
    25/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine