Cálculo y control detallado del proceso de construcción del tramo atirantado del Puente de la Constitución de 1812 sobre la Bahía de Cádiz

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 278-279, v. 67
Page(s): 111-122
DOI: 10.1016/j.hya.2016.03.006
Abstract:

Detailed analysis and control of the construction process of the Constitución de 1812 Bridge over the Cadiz Bay

The erection of the bridge with an almost symmetrical balanced cantilever, with a maximum length of 218.5m, with no additional supports apart from the tower itself, and the erection of the truly massive segment of about 20.0m long, 34.30m wide, and up to 4,000kN in weight, establishing the construction sequence when part of the towers were already erected, have made the calculation and control of the construction a significant challenge.It has required a detailed analysis of the 1275 construction stages using non-linear geometric and material calculations, checking all the cable stays, tower and deck elements, including accidental actions, such as fallen segments, exhaustively controlling all loads on the deck and changes in the construction sequence.

Keywords:
balanced cantilever non-linear analysis nonlinear calculation non-linear calculation Detailed control Construction sequence Cable-stayed deck Erection procedure

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.hya.2016.03.006.
  • About this
    data sheet
  • Reference-ID
    10075454
  • Published on:
    27/03/2018
  • Last updated on:
    07/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine