Calculation of the elevator round-trip time under destination group control using offline batch allocations and real-time allocations
Author(s): |
Albert So
Lutfi Al-Sharif |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Building Engineering, March 2019, v. 22 |
Page(s): | 549-561 |
DOI: | 10.1016/j.jobe.2019.01.013 |
- About this
data sheet - Reference-ID
10298561 - Published on:
29/01/2019 - Last updated on:
21/02/2019