0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cable Creation

Cable-Stay Erection on a New Bridge in Poland Used the Strand by Strand Method

Medium: journal article
Language(s): English
Published in: Bridge Design & Engineering, , n. 25, v. 7

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10001055
  • Published on:
    15/12/2001
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine