0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Building Water Quality Commissioning in Healthcare Settings: Reducing Legionella and Water Contaminants Utilizing a Construction Scheduling Method

This publication lists 63 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10744560
  • Published on:
    28/10/2023
  • Last updated on:
    07/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine