Building Schedule Risks Simulation by Using BIM with Monte Carlo Technique
Author(s): |
Noor H. Kadume
Hafeth I. Naji |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | IOP Conference Series: Earth and Environmental Science, 1 September 2021, n. 1, v. 856 |
Page(s): | 012059 |
DOI: | 10.1088/1755-1315/856/1/012059 |
License: | This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
Download full text file (PDF)
1.31 MB
Advertisement
Advertisement
1.31 MB
- About this
data sheet - Reference-ID
10780959 - Published on:
12/05/2024 - Last updated on:
05/06/2024