0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 5, v. 57
Page(s): 46-49
Abstract:

Charles Seim discusses the struggles of the original bridge advocates to garner support for the Golden Gate Bridge, an idea which originally met with a considerable amount of public opposition. Seim draws upon his own familiarity with the history and the recollections of Howard Schirmer, engineer for the bridge’s north tower, to describe, step by step, the process by which the bridge was built, the problems encountered and the various innovative techniques used on the Golden Gate Bridge.

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015695
  • Published on:
    26/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine