Building Maintenance Management in a Malaysian University Campus: A Case Study
Author(s): |
Olanrewaju Abdul Lateef
Mohd Faris Khamidi Arazi Idrus |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Australasian Journal of Construction Economics and Building, July 2010, n. 1-2, v. 10 |
Page(s): | 76-89 |
DOI: | 10.5130/ajceb.v10i1-2.1593 |
Abstract: |
University buildings require maintenance in order to create a conducive environment that supports and stimulates learning, teaching, innovation, and research. The prime objective of maintenance is to ensure, as far as practicable, the continued peak performance of the building throughout its design life. This paper seeks to report the maintenance management system of a university institution in Malaysia. Primary data was gathered through the analysis of a case study. The objectives of the case study are to identify, describe and assess the maintenance management system used by the university. The major conclusion drawn from the case study was that although university building maintenance practices are corrective and cyclical there is a lack of a comprehensive maintenance management framework that guides the decision-making processes. The case study also revealed irregularities in the university’s maintenance management system. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.15 MB
- About this
data sheet - Reference-ID
10338890 - Published on:
05/08/2019 - Last updated on:
02/06/2021