Building a deep isolating wall by an existing rail tunnel
Author(s): |
C. Molins
A. Ledesma |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, July 2006, n. 3, v. 159 |
Page(s): | 219-226 |
DOI: | 10.1680/geng.2006.159.3.219 |
- About this
data sheet - Reference-ID
10556509 - Published on:
24/01/2021 - Last updated on:
19/02/2021