0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Budget allocation for water mains rehabilitation projects using Simos' procedure

Author(s):

Medium: journal article
Language(s): English
Published in: HBRC Journal, , n. 1, v. 13
Page(s): 54-60
DOI: 10.1016/j.hbrcj.2015.04.003
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.hbrcj.2015.04.003.
  • About this
    data sheet
  • Reference-ID
    10324210
  • Published on:
    13/07/2019
  • Last updated on:
    09/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine