0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bridge-weigh-in-motion approach for simultaneous multiple vehicles on concrete-box-girder bridges

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 137
Page(s): 104179
DOI: 10.1016/j.autcon.2022.104179
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2022.104179.
  • About this
    data sheet
  • Reference-ID
    10660670
  • Published on:
    23/03/2022
  • Last updated on:
    23/03/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine