Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
Author(s): |
Janusz Hołowaty
Dariusz Jurkowski |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Civil Engineering and Architecture, December 2015, n. 12, v. 9 |
DOI: | 10.17265/1934-7359/2015.12.005 |
- About this
data sheet - Reference-ID
10590647 - Published on:
15/03/2021 - Last updated on:
15/03/2021