Bridge Erection by Launching is Fast, Safe, and Efficient

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 3, v. 47
Page(s): 60-63
Abstract:

The construction of long prestressed concrete bridges without using formal falsework or self-supporting launching falsework is described. Using the so-called incremental launching method (Taktschiebeverfahren), bridges with spans from 30-m to 60-m can be cast without using any type of falsework in a casting bed behind an abutment with increments of 10-m to 30-m length and launched stepwise over the piers into their final position. For longer spans temporary supports are necessary. Simple handling of the mechanized formwork, short transports of steel and concrete guarantee a low amount of man-hours. The advantags advantages the precast construction with high quality concrete and the monolithic construction of casting in situ are combined.

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015614
  • Published on:
    25/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine