The Bridge-Crossing over the River Oka on the Bypass Road near Gorki
Medium: | journal article |
---|---|
Language(s): | English |
Published in: | Structural Engineering International, February 1991, n. 1, v. 1 |
Page(s): | 14-15 |
DOI: | 10.2749/101686691780617931 |
Abstract: |
The 2.4 km long crossing includes the 966 m long bridge and the partially submerged approach embankments. The clearance of navigable spans is 120 x 16 meters. The approach embankment sections are built using the method of hydro-mechanization. |
Keywords: |
Hydro-mechanization Reinforced concrete precast-monolithic piers Steel reinforcing cases Orthotropic and ribbed plates Approach embankments
|