The Bridge-Crossing over the River Oka on the Bypass Road near Gorki

Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 1, v. 1
Page(s): 14-15
DOI: 10.2749/101686691780617931
Abstract:

The 2.4 km long crossing includes the 966 m long bridge and the partially submerged approach embankments. The clearance of navigable spans is 120 x 16 meters. The approach embankment sections are built using the method of hydro-mechanization.

Keywords:
Hydro-mechanization Reinforced concrete precast-monolithic piers Steel reinforcing cases Orthotropic and ribbed plates Approach embankments