Bridge construction above existing underground railway tunnels – A case study from Cheong-Gye Cheon restoration project
Author(s): |
J. H. Shin
J. H. Moon I. K. Lee K. Y. Hwang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, May 2006, n. 3-4, v. 21 |
Page(s): | 321-322 |
DOI: | 10.1016/j.tust.2005.12.036 |
- About this
data sheet - Reference-ID
10133117 - Published on:
07/12/2018 - Last updated on:
07/12/2018