Bridge 1-351 over Muddy Run: Design, Testing, and Erection of an All-Composite Bridge

Author(s):










Medium: journal article
Language(s): English
Published in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1696
Page(s): 118-123
DOI: 10.3141/1696-52
Abstract:

Bridge 1.351 on Business Route 896 in Glasgow, Delaware, was replaced with one of the first state-owned all-composite bridges in the nation. Composites are lightweight construction materials that do not corrode, which results in benefits such as ease of construction and reduced maintenance costs. A summary of the design, large-scale testing, fabrication, erection, and monitoring of this bridge is presented. The bridge was designed to AASHTO load and resistance factor design specifications. A methodology was developed to incorporate the engineering properties of these unique composite materials into the design. The bridge consists of two 13 × 32 ft (3.96 × 9.75 m) sections joined by a unique longitudinal joint. The sections have sandwich construction consisting of a core [28 in. (71.12 cm) deep] and facesheets [0.4 to 0.6 in. (10.16 to 15.24 mm) thick] that provide shear and flexural rigidity, respectively. The composite bridge was fabricated with E-glass preforms and vinyl-ester resin, which offers excellent structural performance and long-term durability. Each of the sections was fabricated to near-net shape in a single step by a vacuum-assisted resin transfer molding process. The overall structural behavior has been accurately predicted with simple design equations based on sandwich theory for anisotropic materials. Large-scale testing of full-sized subcomponents was conducted to prove that the design satisfied deflection, fatigue, and strength limit states. A redundant longitudinal joint was designed that consisted of both an adhesively bonded vertical joint between sections and splice plates. Assembly procedures were developed, and transverse testing of the full-sized joint was conducted. Final bridge sections were proof-tested to the strength limit state. The construction phase included section positioning, joint assembly, and application of a latex-modified concrete wear surface. The bridge was reopened to traffic on November 20, 1998. Results from the long-term monitoring effort will be documented.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3141/1696-52.
  • About this
    data sheet
  • Reference-ID
    10778458
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine