0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Brenner Base Tunnel – geological, construction and logistical challenges and innovations at half time

Author(s):
Medium: journal article
Language(s): English
Published in: Geomechanics and Tunnelling, , n. 5, v. 12
Page(s): 555-563
DOI: 10.1002/geot.201900038

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201900038.
  • About this
    data sheet
  • Reference-ID
    10380176
  • Published on:
    14/11/2019
  • Last updated on:
    14/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine