BIM4D-based scheduling for assembling and lifting in precast-enabled construction
Author(s): |
Lihui Huang
Roshan Pradhan Souravik Dutta Yiyu Cai |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, January 2022, v. 133 |
Page(s): | 103999 |
DOI: | 10.1016/j.autcon.2021.103999 |
- About this
data sheet - Reference-ID
10638069 - Published on:
30/11/2021 - Last updated on:
30/11/2021