0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A BIM-based Techno-Economic Framework and Tool for Evaluating and Comparing Building Renovation Strategies

Author(s):



Medium: journal article
Language(s): English
Published in: Journal of Information Technology in Construction, , v. 28
Page(s): 246-265
DOI: 10.36680/j.itcon.2023.012
Abstract:

Building renovation presents real challenges for project participants which frequently generate high cost and schedule overruns. The disruption caused to occupants is one of the main challenges for the planning and management of renovation works. To better manage occupant interference and enable the acceleration of renovation works, this study aims to develop a novel framework for the assessment and optimisation of renovation strategies using BIM. The concept of disruption is formalised through a renovation ontology using the UML language. To enable process automation, the renovation ontology is then populated, and knowledge related to renovation tasks, constraints, duration, cost, equipment, and disruption are captured, structured and validated with industry partners. A digital tool and a set of Key Performance Indicators are also developed so as to facilitate the identification, assessment and optimisation of renovation scenarios in terms of cost, project duration and disruptive potential. Using a step-by-step process, detailed descriptions of the methodologies and workflows of the proposed framework are finally provided and demonstrated on a live case study located in Greece. The findings show no spatial correlation exist for the disruption concept and also confirm the disruptive nature of building floor renovation which can lead to a low rate of retrofitting them. Furthermore, the findings question the general applicability of the Whiteman et al.’s heuristic suggesting to prioritise the planning and execution of the most disruptive renovation activities as early as possible in the renovation process, and of the preference of Fawcett for a one-off renovation strategy recommending to conduct renovation works in one go as quickly as possible. Ultimately, the TEA framework will be further demonstrated and tested by end-users on three additional European case studies within the RINNO project which will particularly help validating the added value and benefits of the TEA framework from a user perspective.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.36680/j.itcon.2023.012.
  • About this
    data sheet
  • Reference-ID
    10730540
  • Published on:
    30/05/2023
  • Last updated on:
    30/05/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine