0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM-Based Resource Tradeoff in Project Scheduling Using Fire Hawk Optimizer (FHO)

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10692622
  • Published on:
    23/09/2022
  • Last updated on:
    10/11/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine