0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2021.103825.
  • About this
    data sheet
  • Reference-ID
    10625202
  • Published on:
    26/08/2021
  • Last updated on:
    26/08/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine