BIM-based LCA as a comprehensive method for the refurbishment of existing dwellings considering environmental compatibility, energy efficiency, and profitability: A case study in China
Author(s): |
Assima Dauletbek
Peiguo Zhou |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Building Engineering, April 2022, v. 46 |
Page(s): | 103852 |
DOI: | 10.1016/j.jobe.2021.103852 |
- About this
data sheet - Reference-ID
10645795 - Published on:
10/01/2022 - Last updated on:
10/01/2022