0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM-based integrated approach for detailed construction scheduling under resource constraints

This publication lists 29 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10190529
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine