BIM-based draft schedule generation in reinforced concrete-framed buildings
Author(s): |
Ziwei Wang
Ehsan Rezazadeh Azar |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Innovation, April 2019, n. 2, v. 19 |
Page(s): | 280-294 |
DOI: | 10.1108/ci-11-2018-0094 |
- About this
data sheet - Reference-ID
10325240 - Published on:
22/07/2019 - Last updated on:
22/07/2019