BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
Author(s): |
Hyounseok Moon
HyeonSeung Kim Vineet R. Kamat LeenSeok Kang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Computing in Civil Engineering, May 2015, n. 3, v. 29 |
Page(s): | 04014048 |
DOI: | 10.1061/(asce)cp.1943-5487.0000342 |
- About this
data sheet - Reference-ID
10259073 - Published on:
29/12/2018 - Last updated on:
29/12/2018