0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM 4D no planejamento de obras: detalhamento, benefícios e dificuldades

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10411845
  • Published on:
    12/02/2020
  • Last updated on:
    02/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine