0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Big Bay Build

With the erection of temporary works for San Francisco's new self-anchored suspension span progressing, the contractor is ramping up for delivery of the first desctions of deck

Author(s):
Medium: journal article
Language(s): English
Published in: Bridge Design & Engineering, , n. 57, v. 15
Page(s): 30-33

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10048611
  • Published on:
    07/12/2009
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine