Beurteilung der Setzungen bei EPB-Vortrieben der Metro L9 Barcelona

Author(s):

Medium: journal article
Language(s): German
Published in: geotechnik, , n. 1, v. 35
Page(s): 03.Okt
DOI: 10.1002/gete.201110009
Abstract:

Assessment of settlements at EPB drives of Barcelona's metro line 9.

For the construction of the 50 km long Metro Line 9 in Barcelona up to five earth pressure balanced shields have been used at the same time. Along 13.6 km the tunnel is excavated with an excavation diameter of 9.4 m and on a length of 27 km with a diameter of 12 m. Further sections are a 4 km long viaduct and 6 km of tunnels in cut and cover or conventionally excavated tunnels. First sub-sections of the new metro line are in service since December 2009. The advance of tunnels below urban areas requires an intensive preparation and control of the machine advance parameters as well as an intensive topographical and geotechnical monitoring programme. In the present article procedures for the preparation and control of an EPB advance are shown. Main focus is set on the machines working pressures and the resulting ground movements. The positive influence of the shield gap injection will be pointed out. For the analysis and evaluation of the settlements for the advance in soil, the so called "efficiency" will be introduced.

Keywords:
Barcelona Metro Linie 9 efficiency face support preassure
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/gete.201110009.
  • About this
    data sheet
  • Reference-ID
    10067014
  • Published on:
    05/09/2012
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine