Author(s): |
Glenn M. Boyce
Paul T. Gribbon Gary L. Irwin |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Civil Engineering Magazine, July 2004, n. 7, v. 74 |
Abstract: |
The City of Portland, Oregon, is using a hybrid contracting scheme that combines the scheduling advantages of design/build with the control of a construction manager arrangement to construct a multiphase solution to its combined sewer overflow problem. The method is enabling contractors and engineers to work together to find alternative methods of construction that save both time and money. |