Author(s):


Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 7, v. 74
Abstract:

The City of Portland, Oregon, is using a hybrid contracting scheme that combines the scheduling advantages of design/build with the control of a construction manager arrangement to construct a multiphase solution to its combined sewer overflow problem. The method is enabling contractors and engineers to work together to find alternative methods of construction that save both time and money.

Structurae cannot make the full text of this publication available at this time.