0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Berechnung von Risikokosten in der Bauprojektabwicklung

Aktualisierung der Studie von Schubert aus dem Jahr 1971

Author(s):


Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 4, v. 96
Page(s): 299-312
DOI: 10.1002/bate.201800064
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201800064.
  • About this
    data sheet
  • Reference-ID
    10256345
  • Published on:
    29/01/2019
  • Last updated on:
    29/06/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine