0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Bayesian belief network predictive model for construction delay avoidance in the UK

This publication lists 61 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10609106
  • Published on:
    22/05/2021
  • Last updated on:
    16/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine