Barrier identification, analysis and solutions of blockchain adoption in construction: a fuzzy DEMATEL and TOE integrated method
Author(s): |
Haitao Wu
Wenyan Zhong Botao Zhong Heng Li Jiadong Guo Imran Mehmood |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-02-2023-0168 |
- About this
data sheet - Reference-ID
10738898 - Published on:
03/09/2023 - Last updated on:
03/09/2023