Balance of Cost, Time, and Quality Related to Construction Projects Regarding the Reinforced Concrete of Underground Structures using a Meta-Heuristic Algorithm

Author(s):



Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 4, v. 63
Page(s): 103-121
DOI: 10.1515/ace-2017-0043
Abstract:

Underground spaces having features such as stability, resistance, and being undetected can play a key role in reducing vulnerability by relocating infrastructures and manpower. In recent years, the competitive business environment and limited resources have mostly focused on the importance of project management in order to achieve its objectives. In this research, in order to find the best balance among cost, time, and quality related to construction projects using reinforced concrete in underground structures, a multi-objective mathematical model is proposed. Several executive approaches have been considered for project activities and these approaches are analyzed via several factors. It is assumed that cost, time, and quality of activities in every defined approach can vary between compact and normal values, and the goal is to find the best execution for activities, achieving minimum cost and the maximum quality for the project. To solve the proposed multi-objective model, the genetic algorithm NSGA-II is used.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2017-0043.
  • About this
    data sheet
  • Reference-ID
    10476762
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine