0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Automating look-ahead schedule generation for construction using linked-data based constraint checking and reinforcement learning

Author(s):

Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 134
Page(s): 104069
DOI: 10.1016/j.autcon.2021.104069
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2021.104069.
  • About this
    data sheet
  • Reference-ID
    10646672
  • Published on:
    07/01/2022
  • Last updated on:
    07/01/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine