Automated scheduling and control of mechanical and electrical works with BIM
Author(s): |
Shabtai Isaac
Maxim Shimanovich |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, April 2021, v. 124 |
Page(s): | 103600 |
DOI: | 10.1016/j.autcon.2021.103600 |
- About this
data sheet - Reference-ID
10560596 - Published on:
03/02/2021 - Last updated on:
19/02/2021