Auckland rail electrification project, New Zealand: accelerated bridge construction in seismic zones
Author(s): |
Peter Wiles
Andrew Walker David Idle |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Civil Engineering, May 2013, n. 5, v. 166 |
Page(s): | 50-56 |
DOI: | 10.1680/cien.12.00031 |
- About this
data sheet - Reference-ID
10091357 - Published on:
31/12/2018 - Last updated on:
31/12/2018