Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model
Author(s): |
Hany Shoukry Tawfek
Hossam El-Deen H. Mohammed Mohamed E. Abdel Razek |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | HBRC Journal, August 2012, n. 2, v. 8 |
Page(s): | 132-143 |
DOI: | 10.1016/j.hbrcj.2012.09.009 |
- About this
data sheet - Reference-ID
10324400 - Published on:
13/07/2019 - Last updated on:
13/07/2019