0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An assessment of the causes of schedule and cost overruns in South African megaprojects: A case of the critical energy sector projects of Medupi and Kusile

Author(s):

Medium: journal article
Language(s): English
Published in: Acta Structilia, , n. 1, v. 27
Page(s): 119-143
DOI: 10.18820/24150487/as27i1.5
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.18820/24150487/as27i1.5.
  • About this
    data sheet
  • Reference-ID
    10426437
  • Published on:
    13/07/2020
  • Last updated on:
    13/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine