0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessing the Relationship between Constraint Management and Schedule Performance in Chilean and Colombian Construction Projects

This publication lists 57 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10613702
  • Published on:
    09/07/2021
  • Last updated on:
    09/07/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine