0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects

This publication lists 52 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10416300
  • Published on:
    17/03/2020
  • Last updated on:
    17/03/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine