0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach

This publication lists 48 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10689138
  • Published on:
    13/08/2022
  • Last updated on:
    13/08/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine