0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessing the Financial Feasibility of Utility-Provided Backup Power during Project Site Planning

Author(s): (Assistant Professor, Univ. of Florida, 336 Rinker Hall, Gainesville, FL 32611-5703 (corresponding author).)
(Assistant Professor, Univ. of Florida, 336 Rinker Hall, Gainesville, FL 32611-5703 (corresponding author).)
(Assistant Professor, Univ. of Florida, 336 Rinker Hall, Gainesville, FL 32611-5703 (corresponding author).)
Medium: journal article
Language(s): English
Published in: Journal of Energy Engineering, , n. 1, v. 132
Page(s): 2-7
DOI: 10.1061/(asce)0733-9402(2006)132:1(2)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-9402(2006)132:1(2).
  • About this
    data sheet
  • Reference-ID
    10588008
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine