0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessing the failure potential of tunnels and the impacts on cost overruns and project delays

This publication lists 30 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10660418
  • Published on:
    28/03/2022
  • Last updated on:
    28/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine