Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure
Author(s): |
Jean-Paul Paquin
Pierre-Paul Morin Annick Lambert Tamas Koplyay |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, October 2022, n. 10, v. 148 |
DOI: | 10.1061/(asce)co.1943-7862.0002361 |
- About this
data sheet - Reference-ID
10685738 - Published on:
13/08/2022 - Last updated on:
13/08/2022