0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Articulation and Current Practices of Liquidated Damages in Standard Specifications for Highways

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jladah.ladr-959.
  • About this
    data sheet
  • Reference-ID
    10733030
  • Published on:
    04/08/2023
  • Last updated on:
    04/08/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine